Line 4

Local nameLine 4
LocationMaharashtra, India

Green Line 4 of the Mumbai Metro, currently under construction, is part of the metro system for the city of Mumbai, India and is being developed by MMRDA and a consortium of international companies.The 32.32 km line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala to Kasarvadavali via Chembur, Bhandup Mulund and Teen Hath Naka, a popular traffic crossing in Thane. It is estimated to cost ₹14,549 crore. Its construction was expected to begin by June 2018.

It is expected to be completed in 2022 and is expected to provide interconnectivity among the existing Eastern Express Highway at Chembur, Central Railway, Mono Rail, the ongoing Metro Line 2B at Chembur, and the proposed Metro Line 5 at Kapurbawdi, Metro Line 6 in Kanjurmarg and Metro Line 11 in Wadala. It will provide rail based access to the commercial, government bodies and geographical landmarks in Mumbai.

Tags BridgeViaduct
Download Download See more
 

More information and contact

Wikipedia https://en.wikipedia.org/wiki/Line_4_(Mumbai_Metro)

Coordinates 19°8'50.865" N 72°56'5.956" E

Tripomatic - A Travel Guide in Your Pocket

Download for free and plan your trips with ease
Or simply search for Tripomatic in the App Store or Google Play.
Tripomatic Maps The world's first map app tailored for travelers
Use the app Not now