South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot.
Construction of the station was approved in 1987 and completed the next year. Opening was delayed by a dispute between the Massachusetts Bay Transportation Authority and the Massachusetts Architectural Access Board because the station was not accessible. After the MBTA and MAAB reached an agreement on the length of accessible platforms, the station opened in July 1990. The footbridge is in poor condition, with two sets of stairs closed off. The MBTA issued a contract for design of station improvements, including a new footbridge with elevators, in 2020. The station was temporarily closed on February 26, 2021.
Wikipedia https://en.wikipedia.org/wiki/South_Attleboro_station
Official Website https://www.mbta.com/
Coordinates 41°53'51.98" N -71°21'17.955" E