Tripomatic

Satsop Nuclear Power Plant (Not in use)

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was… Read more…

Riverside Hotel
Taxi · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
Walk · 6 min
Corner Café
45 min
Walk · 18 min
Riverside Hotel

Add Satsop Nuclear Power Plant (Not in use) to Your Trip

Create a detailed travel itinerary with smart routing, time estimates, and everything you need for a perfect trip.

3M+ downloads · 4.6 stars · 15 years of trip planning
QR code
Scan to download the app

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was started by the Washington Public Power Supply System in order to meet projected electricity demand in the Pacific Northwest. WNP-1, WNP-2 and WNP-3 were part of the original 1968 plan, with WNP-4 and WNP-5 added in the early 1970s.

WNP-2 was the only unit of the five that was completed and put into operation. WNP-3 and WNP-5 are located on 1,600 acres on the Satsop Site near Elma in Grays Harbor County, Washington. Today the site hosts the Satsop Business Park and the Overstock.com Call Center.

Source: Wikipedia

More Information and Contact

Address 98541, United States
Coordinates 46°57'32.106" N, 123°28'9.79" W
Riverside Hotel
Taxi · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
Walk · 6 min
Corner Café
45 min
Walk · 18 min
Riverside Hotel

Add Satsop Nuclear Power Plant (Not in use) to Your Trip

Create a detailed travel itinerary with smart routing, time estimates, and everything you need for a perfect trip.

3M+ downloads · 4.6 stars · 15 years of trip planning
QR code
Scan to download the app

More interesting places