Baku–Tbilisi–Ceyhan pipeline
The Baku–Tbilisi–Ceyhan pipeline is a 1,768 kilometres long crude oil pipeline from the Azeri–Chirag–Gunashli oil field in the Caspian Sea… Read more…
Add Baku–Tbilisi–Ceyhan pipeline to Your Trip
Create a detailed travel itinerary with smart routing, time estimates, and everything you need for a perfect trip.
The Baku–Tbilisi–Ceyhan pipeline is a 1,768 kilometres long crude oil pipeline from the Azeri–Chirag–Gunashli oil field in the Caspian Sea to the Mediterranean Sea. It connects Baku, the capital of Azerbaijan and Ceyhan, a port on the south-eastern Mediterranean coast of Turkey, via Tbilisi, the capital of Georgia. It is the second-longest oil pipeline in the former Soviet Union, after the Druzhba pipeline. The first oil that was pumped from the Baku end of the pipeline reached Ceyhan on 28 May 2006.
Source: Wikipedia
More Information and Contact
Add Baku–Tbilisi–Ceyhan pipeline to Your Trip
Create a detailed travel itinerary with smart routing, time estimates, and everything you need for a perfect trip.