Tripomatic

ACUA Wastewater Treatment Facility

The Jersey-Atlantic Wind Farm in Atlantic City, New Jersey is the first coastal wind farm in the United States and the first wind farm in… Devamını oku…

Riverside Hotel
Taksi · 8 min
ACUA Wastewater Treatment Facility
2h
Yürüyüş · 6 min
Corner Café
45 min
Yürüyüş · 18 min
Riverside Hotel

ACUA Wastewater Treatment Facility – Geziye Ekle

Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.

3M+ indirme · 4.6 yıldız · 15 yıllık gezi planlama deneyimi
QR code
Uygulamayı indirmek için tara

The Jersey-Atlantic Wind Farm in Atlantic City, New Jersey is the first coastal wind farm in the United States and the first wind farm in New Jersey. It became operational in March 2006 and consists of five 1.5 MW turbines built by General Electric. Each wind turbine reaches a height of 380 feet.The wind farm is located onshore at the Atlantic County Utilities Authority Wastewater Treatment Plant on U.S. Route 30 and is visible from highways approaching Atlantic City. The treatment plant uses approximately 50% of the wind-generated capacity from the wind turbines, providing about 60% of the wastewater plant's electricity needs, with the remaining energy being provided to the main power grid for resale as premium renewable electricity.

Source: Wikipedia

Daha Fazla Bilgi ve İletişim

Official website www.acua.com
Telefon +1 609 272 6950
Adres 1801 Absecon Boulevard Atlantic City, NJ 08232, USA
Koordinatlar 39°22'54.829" N, 74°26'51.944" W
Riverside Hotel
Taksi · 8 min
ACUA Wastewater Treatment Facility
2h
Yürüyüş · 6 min
Corner Café
45 min
Yürüyüş · 18 min
Riverside Hotel

ACUA Wastewater Treatment Facility – Geziye Ekle

Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.

3M+ indirme · 4.6 yıldız · 15 yıllık gezi planlama deneyimi
QR code
Uygulamayı indirmek için tara