Tripomatic

Satsop Nuclear Power Plant (Not in use)

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was… Devamını oku…

Riverside Hotel
Taksi · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
Yürüyüş · 6 min
Corner Café
45 min
Yürüyüş · 18 min
Riverside Hotel

Satsop Nuclear Power Plant (Not in use) – Geziye Ekle

Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.

3M+ indirme · 4.6 yıldız · 15 yıllık gezi planlama deneyimi
QR code
Uygulamayı indirmek için tara

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was started by the Washington Public Power Supply System in order to meet projected electricity demand in the Pacific Northwest. WNP-1, WNP-2 and WNP-3 were part of the original 1968 plan, with WNP-4 and WNP-5 added in the early 1970s.

WNP-2 was the only unit of the five that was completed and put into operation. WNP-3 and WNP-5 are located on 1,600 acres on the Satsop Site near Elma in Grays Harbor County, Washington. Today the site hosts the Satsop Business Park and the Overstock.com Call Center.

Source: Wikipedia

Daha Fazla Bilgi ve İletişim

Adres 98541, United States
Koordinatlar 46°57'32.106" N, 123°28'9.79" W
Riverside Hotel
Taksi · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
Yürüyüş · 6 min
Corner Café
45 min
Yürüyüş · 18 min
Riverside Hotel

Satsop Nuclear Power Plant (Not in use) – Geziye Ekle

Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.

3M+ indirme · 4.6 yıldız · 15 yıllık gezi planlama deneyimi
QR code
Uygulamayı indirmek için tara