Upper Svir Hydroelectric Station
Upper Svir Hydroelectric Station is a hydroelectric station on the Svir River located in the town of Podporozhye, Leningrad Oblast, in… Devamını oku…
Upper Svir Hydroelectric Station – Geziye Ekle
Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.
Upper Svir Hydroelectric Station is a hydroelectric station on the Svir River located in the town of Podporozhye, Leningrad Oblast, in northwestern Russia. It was open on February 13, 1952 and has the total power of 160 MW. It is operated by the TGC-1 power company.The power station contains four turbines, with the power of 40 MW each. The water reservoir formed above the dam is known as Ivinsky Razliv Reservoir. Svir is a part of the Volga–Baltic Waterway, connecting the basins of the Volga and the Neva Rivers, with heavy cargo and cruise traffic. To accommodate the waterway, a lock was built to bypass the dam of the power station.
Source: Wikipedia
Daha Fazla Bilgi ve İletişim
Upper Svir Hydroelectric Station – Geziye Ekle
Akıllı rotalar, süre tahminleri ve mükemmel bir gezi için ihtiyacın olan her şeyle ayrıntılı bir güzergah oluştur.