Tripomatic

Nimoo Bazgo Hydroelectric Plant

The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres from Leh in… 了解更多…

dam
Riverside Hotel
出租车 · 8 min
Nimoo Bazgo Hydroelectric Plant
2h
步行 · 6 min
Corner Café
45 min
步行 · 18 min
Riverside Hotel

Nimoo Bazgo Hydroelectric Plant – 添加到你的旅行

创建详细的旅行行程,包含智能路线、时间预估,以及你打造完美旅行所需的一切。

300万+ 次下载 · 4.6 星 · 15 年行程规划经验
QR code
扫码下载应用

The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres from Leh in the Indian Union Territory of Ladakh. The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project involves construction of a 57-high m concrete dam with five spillway blocks of 13 m each having ogee profile.

The Nimoo Bazgo power project envisages utilizing a rated net head of 34 m to generate 239.30 gigawatt-hours in a 90% dependable year. The project has three surface power units of 15 MW each with a total installed capacity of 45 megawatts. Every unit has a 3.3 m diameter, each 63 m-long penstocks.

Source: Wikipedia

更多信息与联系方式

地址 India
坐标 34°12'54.949" N, 77°11'5.222" E
Riverside Hotel
出租车 · 8 min
Nimoo Bazgo Hydroelectric Plant
2h
步行 · 6 min
Corner Café
45 min
步行 · 18 min
Riverside Hotel

Nimoo Bazgo Hydroelectric Plant – 添加到你的旅行

创建详细的旅行行程,包含智能路线、时间预估,以及你打造完美旅行所需的一切。

300万+ 次下载 · 4.6 星 · 15 年行程规划经验
QR code
扫码下载应用