Tripomatic

Satsop Nuclear Power Plant (Not in use)

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was… 了解更多…

Riverside Hotel
出租车 · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
步行 · 6 min
Corner Café
45 min
步行 · 18 min
Riverside Hotel

Satsop Nuclear Power Plant (Not in use) – 添加到你的旅行

创建详细的旅行行程,包含智能路线、时间预估,以及你打造完美旅行所需的一切。

300万+ 次下载 · 4.6 星 · 15 年行程规划经验
QR code
扫码下载应用

Washington Nuclear Project Nos. 3 and 5, abbreviated as WNP-3 and WNP-5 were two of the five nuclear power plants on which construction was started by the Washington Public Power Supply System in order to meet projected electricity demand in the Pacific Northwest. WNP-1, WNP-2 and WNP-3 were part of the original 1968 plan, with WNP-4 and WNP-5 added in the early 1970s.

WNP-2 was the only unit of the five that was completed and put into operation. WNP-3 and WNP-5 are located on 1,600 acres on the Satsop Site near Elma in Grays Harbor County, Washington. Today the site hosts the Satsop Business Park and the Overstock.com Call Center.

Source: Wikipedia

更多信息与联系方式

地址 98541, United States
坐标 46°57'32.106" N, 123°28'9.79" W
Riverside Hotel
出租车 · 8 min
Satsop Nuclear Power Plant (Not in use)
2h
步行 · 6 min
Corner Café
45 min
步行 · 18 min
Riverside Hotel

Satsop Nuclear Power Plant (Not in use) – 添加到你的旅行

创建详细的旅行行程,包含智能路线、时间预估,以及你打造完美旅行所需的一切。

300万+ 次下载 · 4.6 星 · 15 年行程规划经验
QR code
扫码下载应用