Taiwan High Speed Rail is the high-speed railway of Taiwan consisting of one line that runs approximately 350 km along the west coast, from the capital Taipei to the southern city of Kaohsiung. With construction and operations managed by a private company, Taiwan High Speed Rail Corporation, which also operates the line, the total cost of the project was NT$513.3 billion in 1998. At the time it was built, this was one of the world's largest privately funded rail construction schemes. The system is based primarily on Japan's Shinkansen.
The railway opened for service on 5 January 2007, with trains running at a top speed of 300 km/h, currently running from Nangang to Zuoying in as little as 1 hour and 45 minutes, reaching almost 90% of Taiwan's population. Most intermediate stations on the line lie outside the cities served; however, a variety of transfer options, such as free shuttle buses, conventional rail, and metros have been constructed to facilitate transport connections.
Wikipedia https://en.wikipedia.org/wiki/Taiwan_High_Speed_Rail
Address Taiwan
Coordinates 24°9'6.238" N 120°37'16.35" E