Fajar

Local nameFajar
LocationBukit Panjang, Singapore

The Bukit Panjang LRT is an 8-kilometre automated guideway transit line in Bukit Panjang, Singapore. The BPLRT is currently the only Light Rail Transit line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and parts of Choa Chu Kang in the north-west area of the country. The line was the first LRT line constructed in Singapore, having been opened on 6 November 1999 by then-Deputy Prime Minister Tony Tan.

It is a fully elevated and automated people mover system. The line currently uses the Innovia APM 100 C801, C801A and C801B rolling stock supplied by Bombardier, running in a two-car formation. With a 20-year design lifespan, a major overhaul of the system began in 2019 that is scheduled to complete in 2026, which include a new signalling system and power rails system, as well as rolling stock.

Tags StationPublic TransportTrain StationWheelchair Accessible
Download Download See more
 

More information and contact

Wikipedia https://en.wikipedia.org/wiki/Bukit_Panjang_LRT_line

Address 40 Fajar Road, Bukit Panjang 679004, Singapore

Coordinates 1°23'4.535" N 103°46'15.151" E

Tripomatic - A Travel Guide in Your Pocket

Download for free and plan your trips with ease
Or simply search for Tripomatic in the App Store or Google Play.
Tripomatic Maps The world's first map app tailored for travelers
Use the app Not now